Residential Campus
RESIDENCIAL1.jpg

The land on which the Residential Campus is being developed has a total buildable area of ​​62,270 m2 on which 284 homes will be built. Each apartment could be subdivided into smaller independent studios / suites that together will complete a Coliving complex with 568 rental units.

 

The project first phase promotes 50 apartments of around 200 m2 each, on a 9,903 m2 plot, with a  GLA (gross lettable area) of ​10,893 m2. According to BRH Hybrid System

each apartment is subdivisible into 3 studio/suites with independent access, so that, as a whole, the first phase of the campus has a coliving capacity up to a total of 180 rental units. Construction of this phase is due for completion in December 2023

 

Captura de pantalla 2021-04-17 a las 22.
RESIDENCIAL2.jpg
Captura de pantalla 2021-04-17 a las 22.

1. Open Plan layout.  LOFT  model

2. Lay Out with 2 apartaments (1 bedroom/each )

3. Lay Out  with  1  Apartm. (2 bdr). + 1 Studio

4. Lay Out  with  1 Apt.(1 bdr.) + Studio + Suite

5. Lay Out with 3 Suites / bedrooms

6. Lay Out with 4 Suites / bedrooms

7. Lay Out with 4 Apartamentos

8. DUPLEX model

 

The 1st Phase project proposes a variety of  lay outs, with studio / suites of different sizes, in keeping with the needs of its owners and tenants. For this sake, we propose a flexible open plan lay out, with   structural and M&E invariable vertical elements  (1)

Each of the units for rent will be fully equipped, with high-end domotic technology which will connect with security, healthcare, restauration, maintenance and cleaning services to be  managed both by the owner / tenant and by the Campus Administration.

 

Captura de pantalla 2021-04-18 a las 1.2

As shown in the floor plan, the standard apartment could contain four bedrooms with a large kitchen-dining and living  room area or could be divided into three independent units:  one-bedroom apartment, plus a Studio / Suite, plus a Double Studio, all of them with independent access.

In this  case, the BRh financing model will vary depending on the functional needs raised by the buyer regarding the use of his property.

BRH Phygital Campus /sotogrande - 2021